The purpose of this Phase 1 project was to upgrade street and pedestrian lighting and traffic signals, by replacing deteriorating and substandard lighting and signal poles, foundations, junction boxes, conduit, wiring, load centers and signal controller cabinets. The new energy efficient LED street lighting and signal equipment improved lighting levels and quality, reduced future maintenance and operations, improved operational reliability, conformed to current standards and codes, and improved safety.